DETAILED NARRATIVE DESCRIPTION OF PROJECT

Aguleri Otu Bridge is a 100m concrete bridge with concrete Cols at each of 5 spans and at intervals of 20m and width of 10.3m. the Dock is reinforced concrete.

DETAILED NARRATIVE DESCRIPTION OF ACTUAL SERVICES PROVIDED BY YOUR STAFF:

Carried out engineering supervision of the construction of the Bridge, which included review of Designs, quality control, soil/material testing surveys to confirm compliance with designed positions etc.

ASSIGNMENT NAME:
Aguleri-Otu Bridge
project type:
Bridge Construction
client:
Anambra State Ministry of Works & Housing
COUNTRY:
Nigeria
Terms:
24 month
date:
Oct. 2013 - Feb. 2015.
architect:
David Oswald
project type:
Interior Design
Terms:
6 month
client:
OceanThemes
Strategy:
Minimalistic
date:
November 22, 2020